The easier way to deliver EV charging at scale

Part S compliance

Easee meets every Part S requirement: 7kW output, Mode 3 smart charging, and OZEV-approved, so every new build is compliant from day one.

Zero project delays

Simplify site management. With Easee Ready, you protect your cash flow, eliminate hardware theft risks on active building sites, and keep the project perfectly on schedule.

Safe and easy to scale

Multi-unit sites come with real grid constraints. Easee’s Dynamic Load Balancing lets you install hundreds of EV chargers without overloading the grid or hitting DNO limits.

Real value for your buyers

Easee chargers integrate seamlessly with dynamic energy tariffs, heat pumps, and domestic solar panels, giving your buyers built-in ways to save on their energy bills.

Smart charging solutions that grow with your customers.

White charger with a small display on a concrete wall with a white U-hook and charging cable

Charge Max

Suitable for home charging and small-scale business use. The perfect solution for residential energy customers

  • Automated smart scheduling: Seamlessly balances charging to automatically draw power during customers cheapest off-peak tariff hours.
  • MID-compliant energy metering: Law-compliant, precise energy measurement built directly into the unit. Transparent billing and hassle-free home-charging reimbursements, straight out of the box.
  • Ecosystem-ready: Built with V2G support from day one, so as the technology matures and the market moves, you’re already ahead of it.

 

Charge Pro

The Easee Charge Pro is the perfect solution for large charging sites.

  • Load & phase balancing : Enables load and phase balancing for up to 101 chargers on a single circuit, online or offline, however large your site.
  • Industrial reliability: Easee chargers include a trusted five-year warranty that provides solid protection and consistent quality you can rely on every day.
  • Easy installation: Configure chargers directly from your phone. Add circuits and backplates to new and existing sites with just a few clicks.

Fit once

Install the low-cost Easee Ready backplate during the main build – using your own electrical contractors. No disruptive retrofit later, no re-opening finished walls, no second site visit. Your development is EV-ready and compliant from day one.

Install EV Ready at low cost

Your preferred electrical contractors install the wiring and the low-cost Easee Ready backplate during the main construction phase. Your development is instantly EV-ready and compliant with building regulations.

Scale without the extra work

When a resident moves in and wants a charger, your team simply plugs in the Easee Plug & Play unit. No new wiring, no electricians, no project re-opened.

Why team up with Easee?

Smart tariff integration

Easee is built on open OCPP protocol, so it connects seamlessly with your existing platforms, apps and billing systems. Full flexibility to work the way you want to, without starting from scratch.

99% Uptime guarantee

Offer a solution you can put your brand’s reputation on. With 99% uptime and hardware built for tough conditions, Easee delivers unmatched trustworthiness.

Over-the-air updates

Keep your customers ahead of the curve. Our chargers optimize energy usage and continuously improve via over-the-air software updates.

Quick installation

Reduce operational friction. Easee chargers are designed for rapid installation by professional installers, making it easier and faster to scale your customer base.

Proven reliability you can count on.

With 97% of issues resolved remotely and a 5-year warranty, Easee gives your team the breathing room to focus on growth.

  • Woman standing in front of a garage next to an Easee EV charger and a charging electric car

Ready to make your next development EV-ready?

Partner with Easee to simplify your next multi-dwelling project. Connect with our UK residential development experts to discuss site plans, Part S regulations, and cost-saving phased rollouts.